Installation
and a Year's operational experience of an on-line BOD monitor supplied
and installed for monitoring Surface Water Run-off at Gatwick airport
,
J Pickering Bsc, Msc - IET Dec 1999
Abstract:
Consultants
acting on behalf of Gatwick Airport In Sept 1995 proposed an on-line
BOD monitor , the Biox-1000 which was installed as a trial unit
from Nov to March 1996. Due to the success of the trial a new
Biox-1010 BOD monitor was installed in April 1996 and has been
in continuous operation since - automatic control has been transferred
from the Toc units to the Biox at the beginning of January 1997.
Three further BIOX-1010 units have been intsalled now at Gatwick
airport, with also an on-line COD unit at the local WWTP.